Industrial Waste Disposal NPL Site – South Carolina
Project was performed for a final cost of $7 million versus the preliminary cost estimated at $12-$25 million
Project was performed for a final cost of $7 million versus the preliminary cost estimated at $12-$25 million
In Florida, laboratory treatability studies were conducted to evaluate the nickel-stabilizing capacity of various soil amendments for the purpose of enhancing the attenuation of dissolved nickel from industrial wash water derived from operations at a power plant fired with Number 6 fuel oil. The wash water, containing an average nickel concentration of 10 mg/L, percolated [...]