A chrome alloy facility located in the Southeast has been using EnviroBlend CR50 to treat roughly 40 tons annually of lead, and cadmium-contaminated chrome dust. Prior to switching to EnviroBlend in 2014, the facility had been using Bantox to treat the dust. EnviroBlend is added in-line as part of their process by using a duct injection method to render their baghouse dust non-hazardous according to the EPA Toxicity Characteristic Leaching Procedure (TCLP). The facility manufactures ingots.
Interested in more stories like this? Fill out the form below for a free download.
These case studies are examples of the extensive work EnviroBlend has completed across the United States. For more information on our project experience please contact us.