The MRI Corp Superfund site is an area where a recycling facility operated from 1961 to 1968 leaving contaminated soil and groundwater as result from facility operations. Over 60,000 tons of lead-contaminated soil was treated with a 2% dosage rate specialty EnviroBlend reagent. The project took bulk pneumatic deliveries, stored material on-site in silos and used a pugmill for mixing. The treated soils were rendered non-hazardous as confirmed by TCLP testing.