EnviroBlend managed the construction activities at East Penn Manufacturing, including excavation, stabilization, placement, and structural compaction of over 30,000 tons of lead-contaminated soil and battery casings at an acid battery manufacturing plant. Also managed remedial closure of two solid waste units. Placed stabilized soil and battery casings into the former ore pit and structurally compacted the material to accommodate future upgrades to the facility. This saved the expense and liability of disposing these materials off-site.